By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
The Web StoryThe Web StoryThe Web Story
  • Home
  • Latest News
  • Top Stories
  • Politics
  • Stories
  • Security
Search
  • Advertise
©2022 The Web Story. All Rights Reserved.
Reading: First successful trial run of train on Katra-Banihal section
Share
Sign In
Notification Show More
Font ResizerAa
The Web StoryThe Web Story
Font ResizerAa
  • Politics
Search
  • Home
  • Latest News
  • Top Stories
  • Politics
  • Stories
  • Security
Have an existing account? Sign In
Follow US
  • Advertise
©2022 The Web Story - All Rights Reserved. | Hosted by LineageHost

Home - Stories - First successful trial run of train on Katra-Banihal section

Stories

First successful trial run of train on Katra-Banihal section

The Web Story
Last updated: January 4, 2025 6:14 pm
By The Web Story
Share
3 Min Read
images 7 1
SHARE

Banihal — Meandering through the Himalayas and snow-capped mountains, the first trial train successfully ran on the Katra-Banihal section on Saturday, in a crucial step towards the final statutory safety inspection next week to determine the commencement of rail services to Kashmir.

The Railways has conducted six trials over the past month on various segments of the track, including major milestones such as India’s first cable-stayed rail bridge, the Anji Khad Bridge, and the iconic arch bridge over the Chenab at Kauri – the world’s highest railway bridge.

“Under the safety trials, we conducted today’s trial. We were part of this run, and it was successful,” Chief Administrative Officer (CAO) of Udhampur-Srinagar-Baramulla Railway Link (USBRL) Sandeep Gupta told reporters.

He said that the Commissioner of Railway Safety would conduct statutory inspections and trials on January 7 and 8.

“After that, the commissioner will submit a report, which will guide further action on starting train services to Kashmir,” he said.

“Everything has worked well so far. We will return to Katra at a speed of 75 kmph. When the Commissioner of Railway Safety conducts trials, they will be at 110 kmph. This trial is in preparation for that,” Gupta added.

The first train run, conducted between Katra and Banihal, thrilled passengers as it passed through snow-covered mountains, where nature’s beauty met engineering marvels.

The train reached Banihal railway station around 1:30 pm, officials said.

Gupta, along with officials from USBRL, Northern Railway, and construction companies, was onboard.

The USBRL project aims to provide rail connectivity between the Kashmir Valley and the rest of the country.

The Anji Khad Bridge, featuring a single pylon rising 331 m above the riverbed, is another engineering milestone achieved under the USBRL project.

Described as a “true engineering marvel”, the bridge has 48 cables on its lateral and central spans. Construction of the pylon began in 2017, with the structure now standing 191 m above its foundation level.

It is the second-highest railway bridge after the iconic arch bridge over the Chenab at Kauri, which is the world’s highest railway bridge at 359 metres above the riverbed – 35 m taller than the Eiffel Tower in Paris.

The Anji Khad Bridge has a total length of 473.25 m, with the viaduct spanning 120 m and the central embankment measuring 94.25 m.

In November, Minister of State for Railways Ravneet Singh announced that Prime Minister Narendra Modi is likely to inaugurate the Vande Bharat train connecting Kashmir to New Delhi on the USBRL project in January.

With the expected commissioning of train services in phases, the Railways will complete 255 km of the 272-kilometre USBRL project, leaving only a small stretch between Katra and Reasi to be finished by December. — (PTI)

You Might Also Like

Baramulla’s Lt Gen RS Reen takes over as DG at Army Hqrs, Delhi

Dream Big, Achieve More

J&K Witnessed Driest Year In Five Decades In 2024

UditNarayan faces backlash for kissing female fans on lips, ‘disgusting’ says internet

Comprehensive Review Meeting of State Taxes Department Held in Kashmir

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
[mc4wp_form]
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Twitter Copy Link Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article IMG 20250104 WA0020 RampWorks Aviation to Launch Training Centers Across India, Flagship in Kashmir
Next Article IMG 20250104 200426 India Can Host Music Festivals Bigger Than Coachella: Diljit Dosanjh In Meeting With PM Modi
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Latest News

IMG 20260907 212941
Nahida Nabi, J&K’s First Woman Kabaddi Referee, Honoured at State-Level League
Latest News September 7, 2026
IMG 20260901 WA0063
Op Sindoor was a multi-domain operation, not just a border battle: Vice Chief of Army Staff
Security September 1, 2026
IMG 20260824 223915
Sopore Kabaddi Coach Nahida Nabi Joins Kupwara Yogasana Event, Stresses Multi-Sport Approach
Stories August 24, 2026
IMG 20260820 231637
Rising Autoz opens showroom in Srinagar; Altaf Bukhari terms it boost to entrepreneurship
Latest News August 20, 2026
//

We influence 20 million users and is the number one business and technology news network on the planet

Top Categories

  • About
  • Advertise
  • Careers

Sign Up for Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

[mc4wp_form id=”847″]

The Web StoryThe Web Story
Follow US
©2022 The Web Story. All Rights Reserved. | Hosted by LineageHost
Welcome Back!

Sign in to your account